Well, none of that is bound to happen here, knock on wood.
Theres always an asterisk on any projection at this early point since a pics campaign hasnt fully kicked in.
Studios in the social media era always significantly backload their campaign pushes.

(L-R) ‘Lilo & Stitch’ and Tom Cruise in ‘Mission: Impossible - The Final Reckoning’Disney/Everett
Thats whenTop Gun: Maverickyielded Tom Cruises best opening ever at a $126.7M 3-day/$160.5M 4-day.
